DESIGN
OUR PROJECTS ARE SUMMARY INTO THREE CATEGORIES:
- PhotovoltaicEolicBiogas
PHOTOVOLTAIC
In addition to the design and construction of photovoltaic systems on the roofs, 4S RE FUTURE develops large systems by supporting the customer from the feasibility study of a site, developing the design, starting the authorization process, building the system and managing its maintenance.
The photovoltaic systems that we are planning amount to a total of 145 MW and in particular:
- COMMUNE DI MONREALE (PA)- Contrada Malvello- 8.69 MW
- MUNICIPALITY OF TROINA (EN) - Contrada Lapiscio - 50.05 MW
- MUNICIPALITY OF ENNA (EN) - Contrada Pasquasia - 68.52 MW
- MUNICIPALITY OF MINEO (CT) - Contrada Tardia - 9.90 MW
- MUNICIPALITY OF VILLAFRATI (PA) - Contrada Stallone - 982.80 kw
- MUNICIPALITY OF VILLAFRATI (PA) - Contrada Cefala - 982.80 kw
- MUNICIPALITY OF MARINEO (PA) - Contrada Fiduccia - 982.80 Kw
- MUNICIPALITY OF CACCAMO (PA) - Contrada Portella di Palma - 982.80 kw
- MUNICIPALITY OF MARINEO (PA) - Contrada Costa di Zita - 982.80 Kw
- MUNICIPALITY OF VICARI (PA) - Contrada La Catena - 982.80 kw
- MUNICIPALITY OF CEFALA' DIANA (PA) - Contrada Fontanazze - 589.68 kw
with a design forecast for another 500MW
INSTALLATIONS ALREADY BUILT
In addition to the design, we also take care of the construction of the plants themselves throughout the national territory, specifically:
- MUNICIPALITY OF VILLAFRATI (PA) - Contrada Stallone - 982.80 kw
- MUNICIPALITY OF MARINEO (PA) - Contrada Fiduccia - 982.80 Kw MUNICIPALITY OF LENTINI (SR) - Contrada Dagala - 999.60 Kw
- MUNICIPALITY OF CACCAMO (PA) - Contrada Portella di Palma - 982.80 kw
- MUNICIPALITY OF VICARI (PA) - Contrada La Catena - 982.80 kw
- MUNICIPALITY OF CEFALA' DIANA (PA) - Contrada Fontanazze - 589.68 kw
- MUNICIPALITY OF GROSSETO - Via del Commendone - 999.12 Kw
- MUNICIPALITY OF GROSSETO - Via Senese, 58 - 800.40 Kw
- MUNICIPALITY OF MELARA - Via Corno snc - 7.89 Mw
WIND
Between 2013 and 2018, Engineer Stropoli designs and builds 40 turbines in Sicily, starting his business in the mini wind power sector, building two mini wind farms in the Municipalities of Valledolmo and Sclafani Bagni.
2.4 MW THE INSTALLED POWER
Thanks to the experience gained in the sector, we manage the maintenance of 150 turbines in Sicily, Sardinia, Calabria, Puglia and Basilicata.
BIOGAS
4S RE FUTURE starts the design of Biogas plants in the province of Palermo in 2021.